2 Week Lead Time · Assembly & Delivery Included

11kV Package Substations, In Stock and Ready to Install — Fast

We turn your requirements into a single, specified package substation. No compromise, no chasing suppliers — just one point of contact.

Single point of contact
315kVA–1500kVA
DNO, iDNO and G81 approved
Bespoke cabinet spec

A Complete, Single-Source Package

We coordinate all core substation components into one unified delivery. Eliminate the hassle of multi-vendor lead times and mismatched mechanical specifications.

Transformers (315-1500kVA)

Fluid filled, highly efficient transformers customized precisely to UK Distribution Network Operator specifications.

Ring Main Units

SF6-insulated or solid shielded SF6-free options to provide exceptional reliability and electrical safety. Covering all DNOs.

LV Cabinets (800A/1600A)

Robust low-voltage distribution cabinets equipped with fuse-ways engineered to load demands.

GRP Housings (TR1/TR7/TR18)

High durability glass reinforced plastic enclosures protecting your substation with optimal ventilation.

Pre-Cast Concrete Bases

Structural precision concrete foundation plinths enabling incredibly fast drop-and-set site installation.

GRP Grating

Non-conductive, corrosion resistant safety floor grating providing slip safety and trench access.

Why Choose Jointing Tech?

Over 30 years as the UK's leading specialist power distributor allows us to solve site logistical challenges before they compromise connection schedules.

  • No storage fees

    Delayed site ready? We can hold your package substation until your civil contractors are fully prepared.

  • Fast delivery (2 weeks on stock units)

    The typical UK route runs 16–24 weeks for the substation alone. We work in weeks, not quarters — our fastest completed build was four days.

  • Inclusive pricing (HIAB crane lift offload)

    No surprise plant-hire charges. We arrange dedicated HIAB vehicles for direct offload of your package substation along with its GRP housing.

  • Combined deliveries

    All mechanical and electrical elements on a single vehicle, arriving exactly when we promise.

  • Quality assured (Full factory test certification)

    All electrical routine tests completed and documentation pack delivered.

One Supplier, or Three?

The same 500kVA package, specified to UKPN standard with four LV ways — bought the usual way, and bought from us.

Comparison of a typical multi-supplier route against a Jointing Tech single-source package
  Typical multi-supplier route Jointing Tech
Substation lead time 16–24 weeks 2 weeks fastest build: 4 days
GRP housing (TR7) 4–6 weeks, ordered separately Supplied with the package
Pre-cast concrete base 3–4 weeks, third supplier 3–4 weeks supplied direct by us
Factory assembly Charged as an extra Included
Delivery to site Charged per item, per supplier Included substation and housing on one delivery
Deliveries to coordinate Three, on dates you chase One, on a date we commit to
Suppliers to manage Three One

Lead times are typical for a UK mainland delivery and are confirmed on your quote. Base delivery is priced once we have your site postcode.

Proven Substation Installations

View some of our recent specialist power packages successfully delivered and energized across the UK infrastructure grid.

Get Your Package Substation Quote

Submit your project specifications below. Our UK team of specialist power engineering estimators will review details and provide a fully priced package specification.

  • Typical quote response within 24-48 working hours.
  • Dedicated Estimating Engineer assigned to your project.

By sending this enquiry you agree to our standard trade terms and privacy policy.

Frequently Asked Questions

A package substation is a compact, pre-assembled 11kV electrical distribution unit. It combines a high-voltage transformer, high-voltage switchgear (such as a Ring Main Unit), and low-voltage distribution cabinets into a single, coordinated structural package. Because these units are fully assembled and routine tested in the factory prior to transport, they bypass extensive on-site mechanical fit-outs. Consequently, this minimizes civil engineering costs, slashes the risk of component mismatches, and dramatically accelerates the grid connection timeline on-site.

Stock units leave us in around two weeks, and our fastest completed build went out in four days. For comparison, the standard route through separate suppliers runs 16–24 weeks for the substation on its own. Where a full package is needed, the pre-cast concrete base becomes the longest single item at three to four weeks, so that is the date we plan the programme around. Tell us your energisation date and we will tell you honestly whether it is achievable.

Yes — transformer, ring main unit, LV cabinet, GRP housing and pre-cast base all come from us on one order, one programme and one invoice. The substation and its housing travel on the same lorry, so there is no lining up of separate delivery dates between three suppliers, and no risk of a housing arriving on a site with nothing to put in it.

Line by line, not always — a specialist selling one component in isolation can sometimes beat us on that component. What we remove is everything around it: separate assembly and delivery charges on each item, three sets of lead times to reconcile, and the weeks of programme risk that come from coordinating suppliers who have no contract with each other. On a project where the connection date carries a cost, that is usually where the money actually sits.

Partnered with the best names in the industry